11-12 November 1999Opening devotion (Robert Roethemeyer) ProjectMilestone 1 signoffAgreed, that the CAIS Council directs the CAIS Contract Administrator to signoff on Milestone 1 on behalf of the CAIS Council. Project Plan preparationPaul Setze presented a template version of the MS Project document for adaptation by campuses. A final copy is due to Scotti by Dec 31. Local PDD developmentScotti presented a template version of the Project Definition Document for adaptation by campuses. A final copy is due to Scotti by Dec 31. Issue resolutionGEN-04 – employer ID - Don Sylwester will continue to study this (due Nov 19) GEN-14 – reports – more information is needed Question: will SCT support report creation/modification to meet BHE/CUS common requirements in conjunction with the prototype? (to be answered by SCT/CAIS administration – due Nov 19) Question: does each module provide adequate standard reports? (to be answered by each BPA Team – due ASAP – Scotti remind team leaders) GEN-17 – end user reporting training –Ron, Eric, and Gene will study this (report due Nov 19) GEN-18 and secure doc printing – Denny S., Don, Eric will report (report due Nov 19) Milestones Check SheetA brief explanation was presented. Schedule next Council meetingJanuary 20-21, pending confirmation of the AD Tech session. ReportsCAIS Status ReportScotti presented his status report. CAIS Budget ReportScotti presented the CAIS operating budget for FY 2000. SCT Status ReportPaul presented his status report. Local campus reportsThe campus representatives summarized recent events and processes on the campuses. Banner 4.0 highlightsA worksheet was distributed and briefly discussed. Deployment of Banner 4.xScotti and Paul will develop a detailed analysis of the risks and benefits of moving to 4.x during the project. Banner 3.x Navigation CDCampus copies of the CBT course were distributed. PrototypePrototype assessment (Scotti)Student go-live date scheduling (Scotti)Citrix server statusScotti reported that the Citrix server is now operational but access and security require further work. Address Types; Congregation/District codesSolutions are in the final stages of description and will be made available as soon as possible. Parent Address procedurePaul Setze presented an analysis of the parent address issue. Agreed, that the proposed Solution #1 be adopted as the current working solution. Further work on solutions will be developed through the CAIS Service Center. Final Testing Procedure7 test areas· FIN · HR · STU · FA · AD · Banner systemwide · technical Team members· consultant(s) makes presentation · chair and vice chair (or their appointees) · Paul and Scotti · Council representation · all team members informally review via Citrix 1. Agree on what is being tested in each module· Paul's list of Banner objects · Team's list of functionality · a technical status report will be produced but there is no expectation of full signoff relative to prototype 2. Test Team agrees on order and method for performing tests3. Approval· Team reports findings to PMs · PMs coordinate fixes · fixes reviewed by original team via Citrix · Team forwards approval to Don/Scotti/Alan for Council · Council ratifies and Alan signs off · Each module signed off separately Agreed, that the above framework will be further developed by Scotti and Paul, and sent out to the Council for comment. ImplementationScheduling of non-core module installationsThe current report was reviewed. A final copy is due to Scotti by Dec 31. Matrix of requested submodulesThe current report was reviewed. A final copy is due to Scotti by Dec 31. Matrix of interface requirementsThe current report was reviewed. Updates are to be sent to Kathy Roberson by Nov 19, and a final copy is due Dec 31. Service Level AgreementsScotti’s draft will be reviewed by Bob, Eric, and Ron. Campus PipelineResearch into the advertising dimension of the product will continue. Learning SuiteEric stated that St. Paul is interested in installing and experimenting with the Learning Suite as soon as possible. TrainingAttendance policy (Al)The Council was reminded that they are responsible for assuring that the right people are at each session, and that they are to discuss any proposed changes in attendance with Scotti as soon as the issue is known. Technical and Functional training schedulesThese were reviewed. MiscellaneousScotti will prepare a data entry standards document for the next Council meeting. Respectfully submitted, |
|
Copyright © 2003 Concordia Administrative Information System. Last Modify: 03/30/07 16:09 |